The short answer: The Irvington BART station is planned but not fully funded, and I would not treat any opening date as firm. The 2031 target depended on construction starting as early as mid-2026 and on funding that has not been secured. As of BART’s January 2026 letter, the project had $122 million against a 2021 cost estimate of $282 million, and that estimate is now out of date. In February 2026, the City put the remaining need at $200 million.
Irvington has been waiting for this station for decades. It was first studied in 1979 and approved by the BART Board in 1992. If you are buying or selling nearby, what matters is the difference between a plan and a funded project.
Where will the Irvington BART station be?
The planned station sits at Washington Boulevard and Osgood Road, about halfway between the Fremont and Warm Springs/South Fremont stations. BART’s 2019 plan reduced the site from 25.9 acres to 13.1 acres and cut parking from 960 spaces to about 250.
When will Irvington BART open?
There is no funded construction schedule that I would rely on. The City’s project page says construction could start as early as mid-2026 with an opening in late 2031, subject to funding and property acquisition. Those conditions were not met as of BART’s January 2026 letter, and I found no announcement of construction starting.
The City’s project page still says design is approaching 90%. BART’s January 2026 letter says less than 80%, and the City’s own February 2026 letter to the state says 80%. I am using the newer figures.
What is stopping the station?
The main obstacle is money, followed by unfinished design and land work. BART’s January 2026 letter gives the clearest public snapshot:
| Item | Status in January 2026 |
|---|---|
| 2021 cost estimate | $282 million |
| Funding secured | $122 million ($120 million Measure BB, $2 million Regional Measure 2) |
| Gap against the 2021 estimate | About $160 million, likely different today |
| Design | Less than 80% complete |
| Properties acquired | 14 of the 17 needed |
| Regional grant priority | Not listed in MTC’s state grant framework |
| BART’s position | Unable to commit funding, with shortfalls of about $350 million a year |
BART recommended an independent cost update and a new ridership forecast before any further funding push. BART’s position, as reported by KQED, is that the station would not be a priority for the foreseeable future even if Fremont found the money.
The picture is not all negative. The same BART letter notes that Irvington is listed as a near-term priority in Plan Bay Area 2050+, the region’s long-range plan. A place in a long-range plan is not the same as construction money, but it keeps the project in line for future funding rounds.
Who is responsible for funding it?
That is disputed. BART says a 2017 letter of intent makes Fremont responsible for raising construction money beyond the county’s share. State Senator Aisha Wahab has argued that BART should pursue state funding for what she calls a shovel-ready project. The City says it has already put $45 million into the project.
In a February 17, 2026 letter, which also cites that $45 million, Mayor Raj Salwan called the state’s Transit and Intercity Rail Capital Program the best source for the $200 million still needed. Because Fremont is not a transit agency, it cannot apply on its own, so the City asked the state to let project sponsors apply, with BART still building the station.
I am not taking a side. For a homeowner, the practical point is the same: the parties have not agreed on a funded path.
How does the November 2026 transit measure affect it?
The Connect Bay Area measure, Measure RTM on the ballot, went to voters on November 3. It is a 14-year sales tax of half a cent in Alameda County, meant to keep current transit service running. BART warned in January that without new revenue, service could be cut by nearly 70% during 2027, with 15 stations closed.
Early returns reported by KQED showed Measure RTM passing with about 61.5% of the vote across the five counties. The results were still unofficial as of November 17, 2026.
The measure pays to keep existing service running. I have not seen it named as a source of Irvington construction money. It does settle one uncertainty that both BART and the City cited this year, which was BART’s own operating future. The construction gap itself is unchanged.
Should you pay more for a home near the future station?
I would price Irvington homes on what exists today: the house, recent comparable sales, and the actual commute to the current Fremont or Warm Springs stations. Treat the station as possible future upside, not something you are already buying. Zillow’s September 2026 Irvington value was about $1.24 million, but your block and home type matter more than a neighborhood average. My breakdown of Fremont home prices explains why the different measures disagree.
If you are buying, ask what you would think of this home if the station never opened. Also consider that construction, if it happens, could bring disruption before it brings convenience.
If you are selling, describe the station accurately. “Planned, not yet funded” is honest and easy for a buyer to verify. Implying that a station is on the way can create more problems than it solves.
What I see in practice: I can’t point to a price effect from the planned station in Irvington. I can’t show one in the comps, so I would not ask a buyer to pay for one, or tell a seller to price for one.
Irvington BART FAQ
Is the Irvington BART station under construction?
I found no announcement that construction has started. As of early 2026, design was about 80% complete, the project was not fully funded, and not all property had been acquired.
When is Irvington BART scheduled to open?
The City’s project page gives late 2031, subject to funding and property acquisition. Treat that as conditional.
How much will Irvington BART cost?
The latest published estimate BART cited was $282 million from 2021. BART has recommended a new independent estimate, and the City put the remaining need at $200 million in February 2026.
Does the Measure RTM transit tax pay for Irvington BART?
Not that I have seen. The measure is meant to maintain current transit service, and it does not name Irvington construction as a use.
Do homes near a planned BART station cost more?
That depends on the home and the evidence in recent sales. For Irvington, I would rely on current comps, not on an assumed station premium.
More Fremont guides: What is a home worth in Fremont right now? · How to verify a Fremont school boundary · Fremont ADU rules in 2026
Weighing a home in Irvington?
I will show you the comps and tell you what I would do with the same information. Get a valuation for your Irvington home, learn how I work with Fremont sellers, or call me at 650-750-6111.
References
- City of Fremont. “Irvington BART Station Project.” Page. Accessed November 17, 2026.
- BART. “Warm Springs Extension News,” including the status of Irvington Station. Page. Accessed November 17, 2026.
- BART Board President Melissa Hernandez. Letter to Senator Aisha Wahab, January 28, 2026. Letter (PDF). Accessed November 17, 2026.
- Mayor Raj Salwan, City of Fremont. Letter to CalSTA on the 2026 TIRCP draft guidelines, February 17, 2026. Letter (PDF). Accessed November 17, 2026.
- KQED. “Aisha Wahab Lambasts BART for Failing to Build ‘Shovel-Ready’ Irvington Station in Fremont.” Article. Accessed November 17, 2026.
- Local News Matters. “Bay Area transit sales tax measure certified to go on November ballot,” July 2, 2026. Article. Accessed November 17, 2026.
- KQED. Measure RTM election results, November 4, 2026, updated November 6, 2026. Article. Accessed November 17, 2026.
- Zillow. “Fremont, CA Housing Market,” data through September 30, 2026. Zillow home values. Accessed November 17, 2026.
This article is general information, not investment advice. Project status can change, so check the City of Fremont and BART for updates. Equal Housing Opportunity.